logo

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening

1PCS
MOQ
$4.90 - $20.00/pieces
Price
SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening
Features Gallery Product Description Request A Quote
Features
Specifications
Copper Jacket Material: CuPb10Sn10
Oil: Lubricating Oil Circulation
Ring: Alloy Sealing Ring
Material: 45# Round Steel
Quality Guarantee: 6months
Application: Construction Machinery
Compatibility: Fits Multiple Bulldozer Models
Size: Standard
Surface Treatment: Heat Treatment
Highlight:

HRC53-57 Bulldozer Front Idler

,

Construction Parts Bulldozer Front Idler

,

Primary Induction Hardening Bulldozer Front Idler

Basic Infomation
Place of Origin: China
Brand Name: YT
Certification: ISO、CE
Model Number: SK07N2
Payment & Shipping Terms
Packaging Details: Export Packaging
Delivery Time: FOB Xiamen or any Chinese port:25-30days . If there are any parts in stock ,our delivery time is only 7-10 days.
Payment Terms: T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Western Union, Cash, Escrow
Supply Ability: 10000 PCS/Month
Product Description

Detail Information

 
Material

40Mn

depth

Primary induction hardening
Colors yellow
Technique casting
Surface Hardness HRC53-57
Warranty time 6 months
Certification ISO,CE
Delivery Time Within 25-30 days after contract established

 

Product Description

 

  SK07N2 Bulldozer Front Idler For Bulldozer Construction parts

 

 

1. What Is front idler ?

 

  The Idler holds significant importance in guaranteeing smooth functionality of track connections and avoiding deviation. It also distributes some weight, enhancing structural integrity and decreasing surface pressure caused by these units. Placed in the middle, a brace supports every track piece, allowing movement management in both ways. A small clearance between the Idler and the wheel promotes system-wide alignment and consistent direction, ensuring reliable and exact performance.

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 0

 

2. Advantages / Features  

 

  High Quality 

    Normalization is applied to this material to enhance its qualities, and the rail's surface is processed through medium-frequency induction hardening, achieving a hardness level of HRC48 to HRC58, with a hardened region depth of at least 4-6mm (attaining HRC45 at this designated depth).

 

High Precision

   Fabricated with a cutting-edge CK5110 large-scale CNC vertical lathe, the component adheres to exacting standards for internal and external measurements and surface polish. This ensures consistent performance of the final guide wheel, boosting the endurance of the mounted parts and guaranteeing system steadiness.

High Durability

    Featuring an innovative layout, the guide wheel is subjected to exact heat treatment for increased toughness, resists collisions, and has a durable tread with a deeply treated area, enhancing longevity and ensuring track integrity. Premium sealing materials strengthen reliability, providing smooth and stable operation.  

 

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 1

 

3. Design/Structure

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 2

Model A B C General Model
SK270 300      
SK300 315   20 SK12, 轮大径635
SK320 325   20 SK310,SK330,SK350
SK330 320   20  
SK350 320   20  
SK460 365   24  
D6R        
D6H        
D20       专用
D31 220 49 16 D30
D50 218 70 16 D53, 山推130s,SD13
D60 245 65 14 D65
D85 250 95 20  
D85SS-2        
T140 270 120 16  
D9 200 60 17 专用
BD2G       专用

4. why choose us?

 

Skilled Production: Supported by 18 years of manufacturing mastery, our workmanship guarantees reliability.
Warranty Coverage: We provide a 6-month assurance for your confidence.
Support Guarantee: Encountering issues such as leakage or wheel failure during the warranty phase? Share a photo with our logo to claim a free replacement part.

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 3

 

 

5. Manufacturing Processes

 

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 4

 

6. Hot Sale Products

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 5SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 6

 

 

7.Customer Feedback

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 7

 

8. FAQ

 

SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 8

 

9.Contact Information

                    SK07N2 HRC53-57 Bulldozer Front Idler For Construction Parts Primary Induction Hardening 9
Whatapp: +86 15880208980
Wechat : Susanruan13
Email : doozer@doozergroup.com
Recommended Products
Get in touch with us
Tel : +86 15880208980
Characters Remaining(20/3000)